Mojave Desert Air Quality Management District-CALIFORNIA

Contact Information:

Mojave Desert AQMD
14306 Park Avenue
Victorville, CA 92392-2310
(760) 245-1661

Or view the Department's
Website



Relevant State Agencies:

Mojave Desert AQMD Regulations

California Public Utilities Commission

California Energy Commission

California BACT Clearinghouse Database

CARB Distributed Generation Program


Major Utilities:

Pacific Gas & Electric

Southern California Gas Company (SoCalGas)

Southwest Gas Company (SWGas)

Southern California Edison Company

Sierra Pacific Power Company

Pacificorp (Pacific Power & Light)

San Diego Gas Electric Company

 

Specific Issues:

 

EMISSIONS REGULATIONS

GUIDE TO FEDERAL REGULATIONS

SITING REGULATIONS

BUILDING, ZONING
AND FIRE CODES

INTERCONNECTION REQUIREMENTS

EXIT FEES

STANDBY RATES

REPORTING REQUIREMENTS

ECONOMIC INCENTIVES

AIR EMISSIONS REGULATIONS:

Air Quality Status

In attainment (AQMD includes the Northern portion of San Bernardino County and the eastern portion of Riverside County)
EPA's Nonattainment Areas

Major Source Threshold

250 tons triggers PSD

Minor Source Permitting Exemption

Less than 100 hp or 3 MMBtu/hr

Minor Source Treatment

BACT

Emergency Generating Limits

None

DE MINIMIS EXEMPTIONS (Must meet 1298)

Engines less than 100 hp and turbines less than 3 MMBtu/hr are exempt from permitting.

MINOR SOURCE PERMITTING

The air district requires BACT for sources that have a potential to emit 25 pounds per day of a criteria pollutant. Officials will consider CARB's guidance for BACT, but will complete their own analysis based on a world-wide search of technologies. Sample BACT for control of NOx from turbines and internal combustion engines is as follows:

Size of Unit

Level of Control (ppm)

>3 MW

9

3-12 MW simple cycle

2.5

3-12 MW combined cycle

5

12-50 MW simple cycle

2.5

12-50 MW combined cycle

5

IC Engines

9



Sources with potential emissions less than 25 pounds per day of all criteria pollutants may receive limits based on the permitting official's discretion.

The permitting process can take up to 180 days. A public comment period of 30 days is required.

TREATMENT OF EMERGENCY ENGINES

Emergency engines must obtain a minor source permit. There is no special treatment for these units.

Get Acrobat Reader
Energy and Environmental Analysis Inc. | US DOE Distributed Energy Program | US EPA Air Quality Division | SiteMap/Search
Send Questions or Comments to
Jessica Rackley | © 2008 Energy and Environmental Analysis Inc., an ICF International Company, All Rights Reserved
1655 Fort Meyer Drive, Arlington, VA 22209